Paul Hauler collection of CIMS construction photographs
Scope and Contents
101 photographs of the various phases of construction on the Center for Integrated Manufacturing Studies (CIMS) building. Related clippings are included in the collection.
Dates
- Creation: 1992-1997
Creator
- Hauler, Paul (Person)
Biographical / Historical
Established in 1992, RIT's Center for Integrated Manufacturing Studies (CIMS) is housed in the Louise Slaughter Building, which opened in 1997. Facilities include a 170,000 square feet of laboratory and office space, a 10-room, 400-seat training and conference center, six large manufacturing bays, and 21 specialized laboratories including: design capture/metrology lab; integrated diagnostics and prognostics lab; materials engineering lab; systems performance and reliability lab; workplace ergonomics lab; product evaluation lab.
CIMS assists companies and organizations of all sizes to develop solutions to their technical and business challenges. CIMS has worked with companies throughout the United States.
Mr. Hauler was Director of Strategic Relations for The Center for Integrated Manufacturing Studies at Rochester Institute of Technology.
Extent
.5 Linear Feet (1 half document box)
Language
English
Overview
The Paul Hauler collection of the Center for Integrated Manufacturing Studies (CIMS) construction photographs consists of 101 photographs documenting various stages of construction of CIMS over a period of several years and some related news clippings.
Arrangement
Collection is organized by series; clippings and photographs. Photographs appear to be in chronological order and by size.
Immediate Source of Acquisition
The collection was donated to RIT Archive Collections by Paul Hauler in September 2013.
Accession number(s):
2013:055
Processing Information
Finding aid created by Lisa Witt in September 2013.
Subject
- Rochester Institute of Technology -- Buildings (Organization)
- Rochester Institute of Technology. Center for Integrated Manufacturing Studies (Organization)
- Title
- Paul Hauler collection of CIMS construction photographs
- Status
- Published
- Subtitle
- RIT Archives
- Author
- Lisa Witt
- Date
- 19 September 2013
- Description rules
- Describing Archives: A Content Standard
- Language of description
- Undetermined
- Script of description
- Code for undetermined script
- Language of description note
- English
Repository Details
Part of the RIT Archives Repository